Limestone under a deck — Montgomery, Calgary

The bare ground under this deck was dug out and graded to drain away from the house, then finished with fabric, wood edging and about 3 inches of 40 mm limestone.

Get a Free Quote

Spring 2027 booking

We’re booking spring 2027: get measured and quoted now. For every service except fence, your quoted price holds for a spring install and there’s no deposit until spring. A quote written from December holds once you approve it, unless the scope or material costs change. Local Lawns is booked out for fall 2026.

Get a spring 2027 quote →

Before & after

Bare dirt to limestone under a Montgomery deck

After
The deck stairs and posts standing in fresh 40 mm limestone
Montgomery · under-deck rock · the stair posts standing in fresh 40 mm limestone
Dug out
The ground under a Montgomery deck dug out to bare soil, old rock pushed to one side
After
The same spot under the deck finished in grey 40 mm limestone
Montgomery · under-deck rock · dug out in the morning, limestone by early afternoon
After
Limestone under the deck held in by pressure-treated wood edging against the lawn
Montgomery · under-deck rock · pressure-treated wood edging between the rock and the lawn

Grass won't grow well under a deck. We excavated the ground under this one, took the old material away, and graded it so water runs away from the house rather than toward the foundation.

Then contractor-grade landscape fabric went down, pressure-treated wood edging set the border, and about 3 inches of 40 mm limestone filled the space under the deck and around the stairs.

Updated

Scope: Montgomery under-deck limestone and grading

Neighbourhood: Montgomery, NW Calgary
Services performed: Under-deck rock: excavation and disposal, grading for drainage, contractor-grade landscape fabric, pressure-treated wood edging, 40 mm limestone

How the space under the deck was dug out and rocked

  1. Excavate. Dug out the area under the deck with our Bobcat MT100 and disposed of the old material.
  2. Grade. Graded the ground to drain away from the house.
  3. Fabric. Laid contractor-grade landscape fabric over the graded ground.
  4. Edging. Set pressure-treated wood edging along the lawn side.
  5. Limestone. Spread about 3 inches of 40 mm limestone under the deck and around the stair posts, then cleaned up.
The ground around the deck stairs dug out, the bucket of our Bobcat MT100 in the corner
The stair corner dug out, before the fabric and limestone

Materials: 40 mm limestone, fabric and wood edging

  • 40 mm limestone (about 3 inches deep)
  • Contractor-grade landscape fabric
  • Pressure-treated wood edging

Tell us about the yard. We aim to call back within one business day, measure within a few days, then send a fixed written price. Under snow, we quote from plans and photos and confirm the measure at the thaw.

Get a free quote

5.0 on Google (16 reviews) WCB covered & insured

Equipment: Bobcat MT100 under the Montgomery deck

Bobcat MT100 track loader, rakes and shovels.

Result: a clean, drained rock floor under the deck

A clean, drained rock floor under the deck that won't turn to mud or weeds, edged neatly against the lawn. The area was dug out in the morning and the limestone was down by early afternoon. If the lawn beside a deck has failed too, that is a sod replacement job for the same crew.

Limestone under a deck — Montgomery, Calgary: common questions

Why put limestone under a deck?

The ground under a deck gets little sun or rain, so grass struggles and bare dirt turns to dust, mud and weeds. Graded, covered in fabric and filled with limestone, it stays clean, drains, and needs nothing from you. Grading it away from the house first keeps water off the foundation.